Mining
Coat and recoat plant, structures and components on site — no heavy steel leaving the lease.
Sectors served
If your steel currently leaves site to be coated, REIDIFY changes that equation.
Coat and recoat plant, structures and components on site — no heavy steel leaving the lease.
Meet sovereign supply requirements with coating capacity that works on or near base, without security or timeline compromises.
Coat components and sleepers where the work already is. No freighting steel off-site for finishing.
Keep projects moving. Coating capacity that arrives on the job instead of waiting in a shop queue.
Large-scale builds get industrial coating without the transport loop or fixed-facility bottlenecks.
Public works and regional projects finished on site — faster turnaround, lower freight cost, no extra logistics.
The comparison
Fixed powder coating works for small, routine jobs — but every job still requires freighting parts to the shop and back, plus waiting in a queue. REIDIFY removes that loop entirely by bringing the spray booth and oven to your site.
| Scenario | Fixed-facility return freight | REIDIFY on-site |
|---|---|---|
| Brisbane metro pallet | $180–$440 | $0 direct customer freight |
| SEQ cross-region pallet | $360–$840 | $0 direct customer freight |
| Interstate standard pallet | $360–$560 | $0 direct customer freight |
| Interstate larger/variable | $120–$400+ (often higher) | $0 direct customer freight |
Figures are indicative Queensland/interstate pallet freight benchmarks (transport only). Real REIDIFY project data will replace these once live jobs are running.
| Stage | Fixed facility | REIDIFY on-site |
|---|---|---|
| Transport to coater | Same day – multiple days | Eliminated |
| Queue / intake | 3–7 business days typical | Significantly reduced |
| Setup / readiness | Depends on shop capacity | Under 2 hours to deploy |
| Cure cycle | Depends on batching/queue | 10–20 minutes typical |
| Return transport | Same day – multiple days | Eliminated |